Yp街机电子游戏

½Ó´ýÀ´µ½Yp街机电子游戏ÍøÕ¾£¬ÎÒÃǽ߳ÏΪÄúЧÀÍ

Ä¿½ñλÖãºÊ×Ò³-×ÊѶÖÐÐÄ>ÐÐÒµÐÂÎŹØÓÚȼÆø±ê¼Ç×®µÄÍâ¹ÛÓÐʲôҪÇó

¹ØÓÚȼÆø±ê¼Ç×®µÄÍâ¹ÛÓÐʲôҪÇó

ȪԴ£º/ Ðû²¼Ê±¼ä£ºÈÕÆÚ£º2022-07-07 0´Î
Ïà¹Ø±ê¼ÇµÄÖ§³Ö½á¹¹Ó¦¡¢ÑŹۡ¢ÄÍÓá £Ë¼Á¿µ½ÍâµØ·çËÙ¡¢°åÃæ³ß´ç¡¢Â·±ßÌõ¼þ¡¢±ê¼ÇЧ¹ûµÈÒòËØ£¬²î±ðȼÆø±ê¼Ç×®»®·Ö½ÓÄÉÐü¹Òʽ¡¢Öùʽ¡¢Ðü±Ûʽ¡¢ÃżÜʽµÈÖ§³Ö·½·¨¡£³ýÂÝ˨¡¢ÂÝĸ¡¢µæȦµÈ½ô¹Ì¼þ¶Æп350g/m2Í⣬ÆäËû¸Ë¼þ¶Æп600g/m¡£
The supporting structure of relevant signs shall be safe, beautiful and durable. Considering the local wind speed, slab size, roadside conditions, sign effect and other factors, different gas sign piles adopt suspension, column, cantilever, gantry and other support methods respectively. In addition to bolts, nuts, washers and other fasteners galvanized 350g/m2, other rods galvanized 600g/m.
ƾ֤ͼֽҪÇó£¬ÖÆ×÷Öù¡¢½á¹¹¡¢ÖùÑ¡Ôñ±ê×¼¸Ö¹Ü£¬º¸½ÓÍýÏ볤¶Èȱ·¦£¬ÇиîÂÁ°å¡£ÔÚÒÑÕ³Ìùµ×ĤµÄÂÁ°åÉÏ£¬Æ¾Ö¤ÍýÏëÒªÇ󣬽«Ó÷´¹âĤïԿ̵ÄÎÄ×ÖÕ³ÌùÔÚÂÁ°åÉÏ¡£ÒªÇóÎÄ×Ö¹æÔò£¬Íâ¹ÛÇå½à£¬ÎÞÆøÅݺÍÖåÎÆ¡£¼ì²é¡£½«ÒÑÕ³ÌùµÄÎÄ×ֵıê¼Ç½á¹¹Óëͼֽ¾ÙÐнÏÁ¿£¬²¢ÓëͼֽÍêÈ«Õչˡ£
According to the requirements of the drawing, make the column, layout, and select the standard steel pipe for the column. If the planned length of welding is insufficient, cut the aluminum plate. On the aluminum plate with the bottom film pasted, according to the planning requirements, the words engraved with the reflective film are pasted on the aluminum plate. The text shall be regular, the appearance shall be clean, and there shall be no bubbles and wrinkles. Check. Compare the logo layout of the pasted text with the drawing and take full care of it.
ȼÆø±ê¼Ç×®Ïà¹Ø±ê¼ÇÖÆÔìÉ̵ıê¼ÇÑÕÉ«ÓÉÅä¾°ÑÕÉ«¡¢Í¼Ðλò×Ö·ûÑÕÉ«¡¢¿ò¼ÜÑÕÉ«ºÍ³ÄÀïÑÕÉ«×é³É£¬±ê¼ÇµÄÕûÌå½á¹¹Óɱê¼Çµ×°å¡¢»¬²ÛºÍ¸Ö½î¡¢±ê¼ÇÍâò¡¢Ö§³Ö¡¢½ô¹Ì¼þºÍ±ê¼Ç×é³É¡£Ïà¹Ø±ê¼ÇÒÔÂÁ°å£¨1.2-3mmºñ£©Îª»ù´¡£¬Ñ¹Á¦£¨»òÕÛµþ£©ºóÔÚÆäÍâòճÌù·´ÉäĤ£¬È»ºóÓÃË¿ÍøÓ¡Ë¢»òÅÌËã»úÇиîĤÖÆ×÷ͼ°¸£¬±³Ãæ×°ÖÃÂÁ²Û£¬Óù¿Àο¿ÔÚÖùÉÏ¡£·´ÉäÖÊÁÏÖ÷Òª½ÓÄÉ×êʯ¡¢Ç¿¡¢¹¤³Ì·´ÉäĤµÈÎ弶·´ÉäĤ¡£
The logo color of the manufacturer of the relevant signs of the gas sign pile is composed of the background color, graphic or character color, frame color and lining color. The overall structure of the sign is composed of the sign base plate, chute and reinforcement, sign surface, support, fasteners and signs. Relevant signs are based on aluminum plates (1.2-3mm thick). After pressure (or folding), the reflective film is pasted on its surface, and then the pattern is made by screen printing or computer cutting film. Aluminum slots are installed on the back and fixed on the column with hoops. The reflective material mainly adopts diamond, strong, engineering reflective film and other five level reflective films.
ȼÆø±ê¼Ç×®
Ê©¹¤Ê±Òª×¢ÖصÄÊÂÏîÒ²Ðí¶à£¬ºÃ±È£º»úеװ±¸µÖ´ïÏÖ³¡ºó£¬Ó¦ÉèÖÃÏà¹Ø±ê¼Ç¡¢Â·À¸µÈ×°±¸£¬ÖÎÀíºÃ·È˺ÍÏà¹Ø£¬ÑÏ¿áƾ֤ÏÖʵ²Ù×÷±ê׼ʩ¹¤¡£ÎªÁ˸üºÃµØ°ü¹ÜÏÖ³¡ÊÂÇéÖ°Ô±µÄ£¬¾¡¿ÉÄÜ×èֹʹʣ¬È·±£Ê©¹¤¡£ÑÏ¿áƾ֤¹¤³ÌͼֽµÄ»®¶¨ºÍÏà¹ØÁ÷Á¿µÄÐÐʻƫÏòÕÉÁ¿±ê¼ÇµÄÉ趨²¿Î»¡£
There are also many matters to be paid attention to during construction, such as: after the mechanical equipment arrives at the site, relevant signs, barriers and other safety equipment should be set up, passers-by and related personnel should be well managed, and the construction should be carried out in strict accordance with the actual operation standards. In order to better ensure the safety of on-site staff, try to avoid safety accidents and ensure safe construction. The setting position of the sign shall be measured in strict accordance with the provisions of the engineering drawing and the driving direction of the relevant flow.
±ê¼Ç×®»ù±¾ÕÉÁ¿ºó£¬Ë¼Á¿¹¤³ÌͼֽÉÏÉèÖõĵص㣬²¢°´»®¶¨ºóÁ¢Ä£°å¡£ÔúÐÞ½¨¸Ö½î¡£½½Öþ»ìÄýÍÁ½½Öþ»ìÄýÍÁ¡¢µØ½ÅÂݶ¤ºÍ»ù´¡·¨À¼²¿·ÖºÏÊÊ£¬µÖ´ïÉè¼Æ±ê¸ßÒªÇó¡£±ê¼ÇÖ§³Öµã½á¹¹µÄÊ©¹¤Ó¦ÔÚ»®¶¨»ù´¡»ìÄýÍÁÇ¿¶È²¢¾­¹¤³ÌʦÅú×¼ºó¾ÙÐС£Ö§Öù·¨À¼ºÍ»ìÄýÍÁ»ù´¡·¨À¼Ó¦±ê×¼¡£ÃÜ·âÐÔÄÜ£¬µØ½ÅÂݶ¤Ï໥ÅäºÏ£¬Å¡½ôµØ½ÅÂÝ˨ºó£¬Ö§Öù²»µÃÍáб¡£
After the basic measurement of the sign pile, the address set on the engineering drawing shall be considered, and the formwork shall be erected after it is solved according to the regulations. Tie building reinforcement. Pouring concrete pouring concrete, foundation screws and foundation flange parts are appropriate to meet the design elevation requirements. The construction of sign support point structure shall be carried out after the foundation concrete strength is specified and approved by the engineer. Pillar flanges and concrete foundation flanges shall be standard. Sealing performance. The foundation screws are safe to cooperate with each other. After tightening the foundation bolts, the pillars shall not be tilted.
ÒÔÉϾÍÊÇÎÊÌâ½â´ðµÄÏà¹ØÄÚÈÝÁË£¬Ï£ÍûÄܹ»×ÊÖúµ½¸÷ÈË£¬Èç¶ÔÕâÒ»ÎÊÌ⻹±£´æÈκÎÒÉÎÊ£¬¶¼½Ó´ý¹Ø×¢ÎÒÃÇÍøÕ¾²¢×ÉѯÎÒÃǵÄÊÂÇéÖ°Ô±£¬½«½ß³ÏΪÄúЧÀÍ¡£
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website And consult our staff, will serve you wholeheartedly.

Ïà¹Ø²úÆ· / Related products

  • µØ¶¤

    µØ¶¤

  • µØ¶¤

    µØ¶¤

  • ¾¯Ê¾×®

    ¾¯Ê¾×®

  • ¾¯Ê¾×®

    ¾¯Ê¾×®

½ØÆÁ£¬Î¢ÐÅʶ±ð¶þάÂë

sitemap¡¢ÍøÕ¾µØͼ