Yp街机电子游戏

½Ó´ýÀ´µ½Yp街机电子游戏ÍøÕ¾£¬ÎÒÃǽ߳ÏΪÄúЧÀÍ

Ä¿½ñλÖãºÊ×Ò³-×ÊѶÖÐÐÄ>ÐÐÒµÐÂÎÅ·ÖÏí¹ØÓÚȼÆø¹ÜµÀʾ×ÙÏߵIJâÊÔÒªÁì

·ÖÏí¹ØÓÚȼÆø¹ÜµÀʾ×ÙÏߵIJâÊÔÒªÁì

ȪԴ£º/ Ðû²¼Ê±¼ä£ºÈÕÆÚ£º2022-07-06 0´Î
Ϊ°ü¹Üʾ×ÙÏߵĵ¼µçÐÔ¡¢Ç¿¶È¡¢ÄÍÇÖÊ´ºÍÄ;ÃÐÔ£¬Ò»Ñùƽ³£ÒËÑ¡Ôñ½ØÃæ»ý´óÓÚ2.5ºÁÃ׵Ķà¹ÉÍ­ÖʵçÏߣ¬ÆÌÉèʱֻ¹ÜÈÃʾ×ÙÏß¼á³ÖÔڹܵÀµÄ¶¥²¿Î»Öã¬ÔÚÈýͨÖзÖÖ§´¦Ó¦½«µ¼ÏßÌÖÂ۵ľøÔµ²ã°þµô£¬°Ñͭо½ÊÔÚÒ»ÆðÊýȦ£¬È»ºóÓþøÔµ½º²¼¹üºÃÌÖÂÛ£¬ÒÔ¼á³ÖÓÅÒìµÄµ¼µçÐÔ¡£
In order to ensure the conductivity, strength, corrosion resistance and durability of the tracer wire, multi strand copper wires with a cross-sectional area of more than 2.5 mm should be generally selected, and the tracer wire should be kept at the top of the pipe as far as possible during laying. The insulation layer of the conductor joint should be stripped off at the branch of the tee, and the copper core should be twisted together for several circles, and then the joint should be wrapped with insulating tape to maintain good conductivity.
ʾ×ÙÏßÓ¦ÁôÓÐÒ»¶¨µÄÏßÍ·ÓàÁ¿£¬²¢×èÖ¹µ¼ÏßÍ·±»ÍÁÈÀ»òÔÓÎïÁýÕÖ£¬ÎªïÔÌ­ÎÞ·¨³öµØµÄʾ×ÙÏß×îºóµÄ½ÓµØµç×裬Ðè½ÓÄÉ°þµô¾øÔµ²ãÂã¶оÏß30cmµÄÓÅÒì½Ó¾³µØ·¥£¬¹ØÓÚ½ÓÄɶ¨Ïò×ê·½·¨ÆÌÉèµÄPE¹ÜµÀ£¬Ó¦Ñ¡ÓÃÇ¿¶È¸ü´óµÄµ¼Ïߣ¬ÒÔ×èÖ¹ÔÚÊ©¹¤Öб»À­¶Ï,µ¼ÖÂÎÞ·¨Ì½²â¶¨Î»£»µ±µ¼ÏßÖ±¾¶Ô¶Ð¡ÓÚÂñÉî²¢ºöÂԵؽéÖʺͿÕÆøµÄ½éÖÊת±äʱ£¬Ê¾×ÙÏß¿ÉÊÓΪÔȳƽéÖÊÖеÄÒ»ÌõÎÞÏÞ¡£
A certain amount of wire head allowance shall be reserved for the tracer wire, and the wire head shall not be covered by soil or debris. In order to reduce the grounding resistance at the end of the tracer wire that cannot go out of the ground, good grounding measures of stripping the insulation layer and exposing the core wire for 30cm shall be taken. For PE pipes laid by directional drilling, wires with greater strength shall be selected to avoid being broken during construction, resulting in the inability to detect and locate; When the diameter of the conductor is much smaller than the buried depth and the medium changes of the ground medium and air are ignored, the tracer line can be regarded as an infinite line in the uniform medium.
¹ÜµÀʾ×ÙÏß
±ðµÄÔÚ×Ô¼ºÏÂÊÖ½Óʾ×ÙÏßµÄʱ¼äҪעÖØÕâЩÊÂÏÇëƾ֤²Ù×÷˵Ã÷ÒªÇóÊ©¹¤£©£º
In addition, pay attention to these matters when connecting the tracer line by yourself (please follow the operation instructions):
1¡¢Óý¼ô¼ô¿ª£¨ÊèÉ¢£©Á½Ìõ²¢ÁªµÄʾ×ÙÏßʱ£¬Ó¦×¢ÖØÁ½ÌõÏßÊÇ·ñÔȳÆ£¬±»ÍÑÀëµÄÁ½Ìõʾ×ÙÏßÍâòҪƽ»¬£¬²»¿ÉÓÐ͹̨¡¢¼â½Ç£¨ºÜÊÇÖ÷Òª£©£¬»áÓ°ÏìÅþÁ¬Æ÷µÄ·ÀË®ÐÔÄÜ¡£
1. When cutting (separating) two parallel trace lines with scissors, attention should be paid to whether the two lines are uniform. The surface of the separated two trace lines should be smooth without bosses and sharp corners (very important), which will affect the waterproof performance of the connector.
2¡¢ÊÇ·ñÓнðÊôÏß©³ö£¬²»¿É½«Í⩽ðÊôË¿µÄʾ×ÙÏßÂñµØ¡£
2. Whether there is metal wire leakage, the tracer line of the leaked metal wire cannot be buried.
3¡¢ÔÚ°þPE±£»¤²ãʱ²»ÒªËðÉ˽ðÊôÏß¡£
3. Do not damage the metal wire when peeling the PE protective layer.
4¡¢½ÓÏßÖùÅþÁ¬ºÃÌÖÂÛºó£¬Ó¦ÓÃÁ¦À­¶¯ÌÖÂÛÁ½Í·µÄʾ×ÙÏߣ¬¼ì²éÌÖÂÛµÄÅþÁ¬Ç¿¶È¡£
4. After the terminal is connected to the joint, pull the tracer wire at both ends of the joint with force to check the connection strength of the joint.
5¡¢²»ÒªÒÅÍü¶Ô·À¸¯/·ÀË®ÅþÁ¬Æ÷µÄ½ô¹Ì£»³öµØºóµÄʾ×ÙÏßÍ·²¿Î»£¬Ó¦Ó÷ÀË®½º²¼ºÍÈÈËõ¹Ü·â½ô¡£
5. Don't forget to fasten the anti-corrosion / waterproof connector; After leaving the ground, the tracer thread head shall be sealed with waterproof tape and heat shrinkable pipe.
6¡¢¹ÜµÀʾ×ÙÏßÓ¦ÔÚÿ¸ö·§Ãž®´¦ÉèÖÃÌÖÂÛ±ãÓÚ¼ì²â£¬Ã¿Îå°ÙÃ×±ØÐèÉèÖÃÒ»¸ö¼ì²â¾®¡£
6. The pipeline tracing line shall be provided with joints at each valve well for inspection, and an inspection well must be set every 500 meters.
ÒÔÉϾÍÊÇÎÊÌâ½â´ðµÄÏà¹ØÄÚÈÝÁË£¬Ï£ÍûÄܹ»×ÊÖúµ½¸÷ÈË£¬Èç¶ÔÕâÒ»ÎÊÌ⻹±£´æÈκÎÒÉÎÊ£¬¶¼½Ó´ý¹Ø×¢ÎÒÃÇÍøÕ¾²¢×ÉѯÎÒÃǵÄÊÂÇéÖ°Ô±£¬½«½ß³ÏΪÄúЧÀÍ¡£
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website And consult our staff, will serve you wholeheartedly.

Ïà¹Ø²úÆ· / Related products

  • µØ¶¤

    µØ¶¤

  • µØ¶¤

    µØ¶¤

  • ¾¯Ê¾×®

    ¾¯Ê¾×®

  • ¾¯Ê¾×®

    ¾¯Ê¾×®

½ØÆÁ£¬Î¢ÐÅʶ±ð¶þάÂë

sitemap¡¢ÍøÕ¾µØͼ