µØÂñʾ×ÙÏßÓÚ¶ÔÏà¹Ø¹ÜµÀµÄ̽²â¡¢×·×Ù¼°¶¨Î»£¬Ò»Ñùƽ³£»á½ÓÄɽðÊôÏßо£¬Í¨¹ý̽²â×°±¸¸ø½ðÊôÏßÊ©¼ÓÐźţ¬ÓÉ̽²âÎüÊÕ»úÎüÊÕÐźţ¬´Ó¶øÕÒµ½Ê¾×ÙÏßµÄ׼ȷλÖ㬼´Í¬²½×·×Ùµ½¹ÜµÀµÄÏêϸλÖã»ÒÔ±ãÓڶԹܵÀ¾ÙÐÐˢм°Î¬ÐÞ¡£ÏÂÃæÀ´½²½²µØÂñʾ×ÙÏß×°ÖÃÅþÁ¬µÄ²Ù×÷˵Ã÷ÄÚÈÝ°É¡£
The buried tracer line is used to detect, track and locate the relevant pipeline. Generally, the metal wire core is used to apply signals to the metal wire through the detection equipment, and the detection receiver receives the signals, so as to find the accurate position of the tracer line, that is, synchronously track to the specific position of the pipeline; So as to facilitate the reconstruction and maintenance of the pipeline. Let's talk about the operating instructions for the installation and connection of buried tracer lines.
²úÆ·ÓÃ;£ºÓÃÓÚÂñµØËÜÁϹܵÀµÄ̽²â¼°Ê¾×Ù¡£
Application: used for detecting and tracing buried plastic pipelines.
ÊÊÓùæÄ££ºÈ¼ÆøÂñµØPE¹ÜµÀ¡¢¹©Ë®ÂñµØPE¡¢PVC¹ÜµÀ¡¢¼°·Ç½ðÊôÂñµØ¹ÜµÀ¡£
Scope of application: gas buried PE pipeline, water supply buried PE, PVC pipeline, and non-metallic buried pipeline.
×°ÖÃÁ㲿¼þ¼°¹¤¾ß
Installation parts and tools
1¡¢ËùÓÐÎïÆ·
1. All items
2¡¢ÅþÁ¬¼Ð/·ÀË®(¸¯)ÅþÁ¬Æ÷
2. Connecting clip / waterproof (corrosion) connector
3¡¢¹¤¾ß
3. Tools
²Ù×÷°ì·¨£ºÖ±ÏßÅþÁ¬
Operation steps: straight line connection
Óüôǯ¼ô¶Ïʾ×ÙÏß--½Â¼ô¼ô¿ªÁ½Ìõʾ×ÙÏß--°þÈ¥PEÍâ±£»¤Æ¤--´©Èë·À¸¯/·ÀË®ÅþÁ¬Æ÷--½ðÊôË¿´©ÈëÀ¶É«½ÓÏßÖùÄÚ--ÓüÐǯ½«ÅþÁ¬¼Ð¼Ð½ô--È·ÈϽӿڴ¦ÅþÁ¬Àο¿--½«·À¸¯/·ÀË®ÅþÁ¬Æ÷½ô¹Ì
Cut off the trace line with scissors -- cut off two trace lines with scissors -- strip the PE outer protective skin -- thread into the anti-corrosion / waterproof connector -- thread the metal wire into the blue terminal -- clamp the connecting clamp with pliers -- confirm that the connection at the interface is firm -- tighten the anti-corrosion / waterproof connector
²Ù×÷°ì·¨£ºÈýͨÅþÁ¬
Operating steps: tee connection
Ìæ»»³ÉÐþÉ«Ë«¿×½ºÍ·--½«ÈýÌõÏß´©Èë·ÀË®ÌÖÂÛ--½ðÊôË¿´©Èë»ÆÉ«½ÓÏßÖùºó¼Ð½ô--½ô¹Ì·À¸¯/·ÀË®ÅþÁ¬Æ÷
Replace with black double hole rubber head -- thread the three wires into the waterproof connector -- thread the metal wire into the Yellow terminal and clamp it -- tighten the anti-corrosion / waterproof connector
ƾ֤²Ù×÷˵Ã÷ÒªÇóÊ©¹¤£º
Construction in accordance with the operating instructions:
1¡¢Óý¼ô¼ô¿ª£¨ÊèÉ¢£©Á½Ìõ²¢ÁªµÄʾ×ÙÏßʱ£¬Ó¦×¢ÖØÁ½ÌõÏßÊÇ·ñÔȳƣ¬±»ÍÑÀëµÄÁ½Ìõʾ×ÙÏßÍâòҪƽ»¬£¬²»¿ÉÓÐ͹̨¡¢¼â½Ç£¨ºÜÊÇÖ÷Òª£©£¬»áÓ°ÏìÅþÁ¬Æ÷µÄ·ÀË®ÐÔÄÜ¡£
1. When cutting (separating) two parallel trace lines with scissors, pay attention to whether the two lines are uniform. The surface of the separated two trace lines should be smooth without bosses and sharp corners (very important), which will affect the waterproof performance of the connector.
2¡¢ÊÇ·ñÓнðÊôÏß©³ö£¬²»¿É½«Í⩽ðÊôË¿µÄʾ×ÙÏßÂñµØ¡£
2. Whether there is any metal wire leakage, the tracer line of the leaked metal wire shall not be buried.
3¡¢ÔÚ°þPE±£»¤²ãʱ²»ÒªËðÉ˽ðÊôÏß¡£
3. Do not damage the metal wire when stripping the PE protective layer.
4¡¢½ÓÏßÖùÅþÁ¬ºÃÌÖÂÛºó£¬Ó¦ÓÃÁ¦À¶¯ÌÖÂÛÁ½Í·µÄʾ×ÙÏߣ¬¼ì²éÌÖÂÛµÄÅþÁ¬Ç¿¶È¡£
4. After the terminal is connected to the joint, the tracer wires at both ends of the joint shall be pulled to check the connection strength of the joint.
5¡¢²»ÒªÒÅÍü¶Ô·À¸¯/·ÀË®ÅþÁ¬Æ÷µÄ½ô¹Ì£»³öµØºóµÄʾ×ÙÏßÍ·²¿Î»£¬Ó¦Ó÷ÀË®½º²¼ºÍÈÈËõ¹Ü·â½ô¡£
5. Do not forget to fasten the anti-corrosion / waterproof connector; After leaving the ground, the tracer thread head shall be sealed with waterproof tape and heat shrinkable pipe.
6¡¢
µØÂñʾ×ÙÏßÓ¦ÔÚÿ¸ö·§Ãž®´¦ÉèÖÃÌÖÂÛ±ãÓÚ¼ì²â£¬Ã¿Îå°ÙÃ×±ØÐèÉèÖÃÒ»¸ö¼ì²â¾®¡£
6. The buried tracer line shall be provided with joints at each valve well for inspection, and one inspection well must be provided every 500m.
ÒÔÉϾÍÊÇÎÊÌâ½â´ðµÄÏà¹ØÄÚÈÝÁË£¬Ï£ÍûÄܹ»×ÊÖúµ½¸÷ÈË£¬Èç¶ÔÕâÒ»ÎÊÌ⻹±£´æÈκÎÒÉÎÊ£¬¶¼½Ó´ý¹Ø×¢ÎÒÃÇÍøÕ¾
²¢×ÉѯÎÒÃǵÄÊÂÇéÖ°Ô±£¬½«½ß³ÏΪÄúЧÀÍ¡£
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website And consult our staff, will serve you wholeheartedly.