¾¯Ê¾´øÓÖ³ÆΪÂñµØ¾¯Ê¾´ø»ò¹ÜµÀ¾¯Ê¾´ø£¬ÊÇÒÔPEĤ×÷Ϊ»ù´ø£¬Æ¾Ö¤Éè¼ÆÒªÇó¾ÙÐаæÃæÓ¡Ë¢¶ø³ÉµÄÒ»ÖÖÓÃÓÚ±ÜÃâÂñµØ¹ÜµÀ±»Îó¿ªÍڵľ¯Ê¾²úÆ·£¬ÆäºÜ»ù´¡µÄÒ²ÊǺÜÖ÷ÒªµÄÉú²ú»·½Ú¾ÍÊÇ´µÄ¤£¬ÏÂÃ泧¼Ò¾ÍΪ¸÷ÈËÏÈÈÝÒ»ÏÂÆäËû·½ÃæµÄÖ÷Òª»·½Ú¡£
Warning tape, also known as buried warning tape or pipeline warning tape, is a warning product used to prevent buried pipelines from being excavated by mistake, which takes PE film as the baseband and and is printed according to the design requirements. Its basic and important production link is film blowing. The following factory will introduce other important links for you.
1¡¢ÖÊÁÏÑ¡¹º
1. Purchase of raw materials
¾¯Ê¾´øÉú²úÖ÷ÒªÖÊÁϼ´ÎªPEÔ­Éú¿ÅÁ££¬Ñ¡¹ºÀú³ÌÖÐҪƾ֤ʯÓÍ¡¢×ÔÈ»ÆøÐÐÒµÏà¹Ø¹ØÓÚ¾¯Ê¾´øµÄÊÖÒÕÒªÇó¾ÙÐжÔӦѡ²Ä£¬ÖÊÁÏ´¿¾»£¬ÎÞÆäËüÔÓÖÊÌí¼Ó£¬²»È»»áÓ°Ï쾯ʾ´øµÄ¿¹À­¼°¿¹ËºÁÑÇ¿¶È¡£
The main raw material for the production of warning tapes is PE primary particles. During the purchase process, the corresponding material selection should be made according to the technical requirements of the oil and natural gas industry for warning tapes. The raw materials are pure and no other impurities are added, otherwise the tensile and tear strength of warning tapes will be affected.
2¡¢Éú²úÇ°ÅäÁÏ
2. Pre production ingredients
ΪÁËÔöÌí¾¯Ê¾´øµÄºá¡¢×ÝÏòÀ­ÉìÒªÇó£¬Ò»Ñùƽ³£»áÔöÌíÒ»¶¨±ÈÀýµÄÏßÐÔ×ÓÁÏ£¬²»¿É¶àÒ²²»¿ÉÉÙ£¬¶àÁ˱¾Ç®À­¼Ó£¬ÉÙÁËÔòÇ¿¶È²»·ó¡£
In order to increase the horizontal and vertical stretching requirements of warning tapes, a certain proportion of linear materials will generally be added, which cannot be more or less. If the cost is more, the strength is not enough.
¿É̽²â¾¯Ê¾´ø
3¡¢ÖÊÁϺæ¸É
3. Raw material drying
ÖÊÁϺæ¸ÉÁËÊǽÏÁ¿Ö÷ÒªµÄ»·½Ú£¬Éú²ú²ÄÐèÒª¶Ô½øÁϾÙÐÐ5-8СʱµÄºæ¸É£¬Î¶ÈÒª¿ØÖƺÏÊÊ£¬ºæ¸ÉÀú³ÌÖÐÒªËæʱÊӲ캬ˮÂÊ£¬ÈôÊÇÖÊÁϺ¬ÓÐË®·Ö£¬ÌìÉúÉúÀ´µÄ²úÆ·ÖÊÁ¿Ò»¶¨È±·¦¸ñ¡£
The drying of raw materials is an important link. The production materials need to be dried for 5-8 hours. The temperature should be controlled appropriately. During the drying process, the moisture content should be observed at any time. If the raw materials contain moisture, the quality of the products produced must be unqualified.
4¡¢´µÄ¤»úÄ£¿Ú¿ØÖÆ
4. Mold mouth control of film blowing machine
¿É̽²â¾¯Ê¾´øÔÚ°ëÖÆƷʱΪͰ״£¬ÐèÒª·ÖÇвŻª³ÉΪӡˢǰµÄ°ëÖÆÆ·£¬ÒÔÊÇÒ»¶¨Òª¿ØÖƺÃÄ£¿Ú£¬²»È»»á³öÀ´¾¯Ê¾´ø¿í¶È¼°ºñ¶È·ºÆðÎó²î£¬ÉϲîÔò±¾Ç®ÔöÌí£¬Ï²îÔò´ï²»µ½¿Í»§ÒªÇó¡£
The detectable warning tape is barrel shaped in semi-finished products and needs to be cut to become semi-finished products before printing, so we must control the die mouth, otherwise there will be deviation in the width and thickness of the warning tape, the upper difference will increase the cost, and the lower difference will not meet the customer's requirements.
ͨ¹ýÒÔÉÏÎÄÕ£¬¸÷ÈË¿ÉÒÔÇåÎúµÄÏàʶµ½ÎÊÌâÄÚÈÝÁË£¬ÐÅÍи÷È˶ÁÍêÕâƪÎÄÕ£¬¿ÉÒԶԸòúÆ·¸ÃÊÂÏîÓÐÒ»¸öÔ½·¢ÉîÈëµÄÏàʶ£¬ºóÐø¸÷ÈËÏëÏàʶ¸ü¶àÏà¹Ø֪ʶÄÚÈÝ£¬¿ÉÒÔÒ»Á¬¹Ø×¢ÎÒÃǵĹÙÍø£¬ÓÐʲôÐèÒª¸÷ÈËËæʱÁªÏµYp街机电子游戏¡£
Through the above article, you can clearly understand the content of the problem. I believe that after reading this article, you can have a more in-depth understanding of the product and the matter. In the future, if you want to know more relevant knowledge, you can continue to pay attention to our official website , please feel free to contact us if you need anything.