Yp街机电子游戏

½Ó´ýÀ´µ½Yp街机电子游戏ÍøÕ¾ £¬ÎÒÃǽ߳ÏΪÄúЧÀÍ

Ä¿½ñλÖãºÊ×Ò³-×ÊѶÖÐÐÄ>ÐÐÒµÐÂÎÅÂñµØPE¹ÜLYA-SZ3ʾ×ÙÏßË«ÏßÁ¬ÌåÓÅÊÆ

ÂñµØPE¹ÜLYA-SZ3ʾ×ÙÏßË«ÏßÁ¬ÌåÓÅÊÆ

ȪԴ£º/ Ðû²¼Ê±¼ä£ºÈÕÆÚ£º2023-11-30 0´Î

1.Ë«Ïߵİü¹Ü×÷Óãº

1. The insurance function of dual lines:

Á½Ìõµ¥ÏßÒ»ÆðʹÓú͡°Ë«Ï߽ṹÉè¼Æ¡±µÄÊÖÒÕÐÔÄÜÇø±ð £¬Á½Ìõµ¥ÏßͬʱʹÓÃʱÒ×¾À¸ð±¬·¢¶ÏÁÑ £¬Á½Ìõµ¥Ï߸¨ÉèºóÎÞ·¨µÖ´ïÏàµÈ³¤¶ÈÇå¾²ÐÐʹÓà £¬¿¹À­µÄÊÜÁ¦µãÂþÑܲ»ÔȳÆ £¬»áµ¼ÖÂÁ½Ìõµ¥Ï߶ÏÁѵÄÏȺó²»* £¬¿¹À­Ç¿¶ÈÖ»ÄÜÌåÏÖÒ»¸ùÏßµÄÇ¿¶È¡£¡°Ë«Ï߽ṹÉè¼Æ¡± £¬ÒѾ­½«Á½Ö§ÏßÕ³ÔÚÒ»Æ𠣬ÓÉÓڽṹµÄת±ä £¬ÆäÊÖÒÕÐÔÄÜÐγÉ* £¬¿ÉÒÔÏàµÈ³¤¶È¸¨É衢ƽÐÐʹÓà £¬¿¹À­µÄÊÜÁ¦µãÔȳÆÂþÑÜ £¬ÐγÉͳһµÄ¿¹À­Ç¿¶ÈÊÖÒÕÖ¸±ê £¬Í»ÆÆÁËÏÖÓÐʾ×ÙÏß²úÆ·¿¹À­Ç¿¶ÈµÍµÄÓ°Ïì¡£

The technical performance difference between using two single lines together and the "double line structure design" is that when two single lines are used at the same time, they are prone to entanglement and breakage. When two single lines are auxiliary, they cannot achieve equal length and parallel use, and the distribution of tensile force points is uneven, which can lead to uneven order of fracture of the two single lines. The tensile strength can only reflect the strength of one line. The "double line structure design" has already glued two branch lines together. Due to structural changes, its technical performance has formed *, which can be used in equal lengths and parallel. The tensile force points are evenly distributed, forming a unified tensile strength technical index, breaking through the influence of low tensile strength of existing tracer line products.

2.±ãÓÚ¹¤µØ¼òÆÓ¼ì²âÅжÏʾ×ÙÏßÆÌÉèµÄÖÊÁ¿¡£

2. Convenient for simple on-site inspection and judgment of the quality of tracer line laying.

ÂñµØPE¹ÜLYA-SZ3ʾ×ÙÏßÅþÁ¬·½·¨

Connection method of LYA-SZ3 tracer line for buried PE pipes

LYA-SZ3ʾ×ÙÏßÓеķÀ»¤ÌÖÂÛ £¬ÓÃÓÚÏßÓëÏßÖ®¼äµÄÅþÁ¬ £¬ÌÖÂ۾߱¸·ÀË®

The LYA-SZ3 tracer line has protective joints for connecting lines, which are waterproof

·À¸¯µÄÃܱÕÇ»Ìå £¬½«Ê¾×ÙÏßÂã¶ÏßÍ·°²ÅÅÓÚÃܱÕÇ»ÌåÄÚ £¬´Ó¶ø±£»¤Â㶵Äʾ×ÙÏßÍ·ÎÞ·¨±»ÇÖÊ´£»ÌÖÂÛÓÉPEÖÊÁÏÖÆÔì £¬×Ô¼º¾ß±¸¿¹¸¯¡¢¿¹ÀÏ»¯µÄÄÜÁ¦¡£

20230630111615766.jpg

A corrosion-resistant sealed chamber, where the exposed tracer wire head is placed inside the sealed chamber to protect the exposed tracer wire head from corrosion; The joint is made of PE material and has the ability of corrosion resistance and aging resistance.

±¡Ä¤Ê¾×ÙÏߺ͵çÏßʾ×ÙÏßµÄÅþÁ¬·½·¨£º½«Á½¸öÏßÍ·Å¡ÔÚÒ»Æ𠣬һÑùƽ³£Ñ¡ÓÃÈÈËõ¶Ì¹Ü»ò·ÀË®½º²¼×öΪÌÖÂ۵Ĵ¦Àí £¬·À¸¯¼°·ÀˮЧ¹ûƾ֤ÈÈËõ¹ÜµÄ²ÄÖʼ°Ê©¹¤Ð§¹û¾öÒé¡£

The connection method of thin film tracing wire and wire tracing wire: Twist the two wire ends together, and generally use heat shrink tubing or waterproof tape as the joint treatment. The anti-corrosion and waterproof effects are determined by the material and construction effect of the heat shrink tubing.

ÂñµØPE¹ÜLYA-SZ3ʾ×ÙÏß̽²âÐÔ

Detection of buried PE pipe LYA-SZ3 tracer line

LYA-SZ3ʾ×ÙÏߣºÍ¨ÀýÆÌÉè £¬ÂñÉî¡Ü1.8Ã×ʱ £¬ÓÐÓÃ̽²â¾àÀëÔÚ1000Ã×ÒÔÉÏ£»·Ç¿ªÍÚÆÌÉè £¬ÂñÉî¡Ü4Ã×ʱ £¬ÓÐÓÃ̽²â¾àÀëÔÚ500Ã×£»·Ç¿ªÍÚÆÌÉè £¬ÂñÉî¡Ü7Ã×ʱ £¬ÓÐÓÃ̽²â¾àÀëÔÚ300Ãס£

LYA-SZ3 tracer line: Conventional laying, effective detection distance above 1000 meters when buried depth ¡Ü 1.8 meters; When laid without excavation and buried at a depth of ¡Ü 4 meters, the effective detection distance is 500 meters; When laid without excavation and buried at a depth of ¡Ü 7 meters, the effective detection distance is 300 meters.

±¡Ä¤Ê¾×ÙÏߣºÍ¨ÀýÆÌÉè £¬ÂñÉî¡Ü1.8Ã×ʱ £¬ÓÐÓÃ̽²â¾àÀëÔÚ150Ã×ÄÚ£»²»¿ÉÓÃÓÚ·Ç¿ªÍÚÆÌÉè¡£

Thin film tracer line: Conventional laying, effective detection distance within 150 meters when buried depth ¡Ü 1.8 meters; Cannot be used for non excavation laying.

µçÏßʾ×ÙÏߺÍLYA-SZ3Ààͬ £¬¿ÉÊÇ·Ç¿ªÍÚÆÌÉèÒªÓõ½½ØÃæ»ýÔÚ6ƽ·½ÒÔÉϵĵçÏß £¬±¾Ç®Ôì¼Û²»ÏàÒË¡£

The wire tracing line is similar to LYA-SZ3, but non excavation laying requires wires with a cross-sectional area of more than 6 square meters, which is not cost-effective.

ÂñµØPE¹ÜLYA-SZ3ʾ×ÙÏß·Ç¿ªÍÚ´©Ô½µÄÓ¦ÓÃ

Application of Buried PE Pipe LYA-SZ3 Tracer Line in Non Excavation Crossing

½«Ê¾×ÙÏßÀ¦°óÔÚ×°±¸ÍÐÍ·µÄ¸ÖË¿»·ÉÏ £¬²¢ÓÃÌúË¿»ò¿¨»·Ôٴνô¹Ì¡£

Bundle the tracer wire onto the steel wire ring of the equipment support head and tighten it again with iron wire or snap ring.

ÿ¸ô5-8Ã׵ľàÀë £¬Óýº´ø½«Ê¾×ÙÏߺÍPE¹ÜÀο¿¡£

Fix the tracer line and PE pipe with tape every 5-8 meters.

¶¥¹ÜÍê³Éºó £¬½«Ê¾×ÙÏßÒ»¶ËµÄÁ½ÌõÏßÅþÁ¬ÔÚÒ»Æ𠣬ÓÃÍòÓñíÕÉÁ¿Ê¾×ÙÏßµÄÁíÒ»¶Ë¿´ÊÇ·ñÓÐͨ·¡£

After the pipe jacking is completed, connect the two wires at one end of the tracer line together, and use a multimeter to measure the other end of the tracer line to see if there is a pathway.

Ïà¹Ø²úÆ· / Related products

  • µØ¶¤

    µØ¶¤

  • µØ¶¤

    µØ¶¤

  • ¾¯Ê¾×®

    ¾¯Ê¾×®

  • ¾¯Ê¾×®

    ¾¯Ê¾×®

½ØÆÁ £¬Î¢ÐÅʶ±ð¶þάÂë

sitemap¡¢ÍøÕ¾µØͼ