电缆警示桩施工的准备事情很主要

泉源:/ 宣布时间:日期:2022-10-19 0
电缆警示桩施工注重事项许多,好比:准备的事情--相关仪器的检查和矫正--举行丈量放线--牢靠交桩--妄想线路--调解交桩--完工后需要纪录相关信息。下面来讲讲它的施工准备事情内容。
There are many precautions for cable warning pile construction, such as: preparation -- inspection and correction of relevant instruments -- surveying and setting out -- fixed pile delivery -- planning route -- adjusting pile delivery -- recording relevant information after completion. Now let's talk about its construction preparation.
1、详细审查研究放线区域的完整的施事情业图纸。
1. Check the complete construction drawings of the study setting out area in detail.
2、提前准备交桩纪录需要的表格及相识接桩组成职员便于相同。
2. Prepare the forms required for the pile delivery record in advance and know the pile receiving personnel to facilitate communication.
3、准备切合要求的丈量仪器、木桩、标笔、白石灰以及其他工具。
3. Prepare qualified measuring instruments, stakes, markers, lime and other tools.
4、将需要丈量放线使用的工具举行矫正,还需要包管这些工具须在划定的有用期规模之内。
4. The tools to be used for surveying and setting out shall be corrected, and it is also necessary to ensure that these tools are within the specified validity.
电缆警示桩
警示桩在操作方面需要注重:
Attention shall be paid to the operation of warning piles:
1、丈量放线的基准点一定要接纳GPS定位,其中放线基准点是指设计控制桩和水准基桩。
1. The datum point of surveying and setting out must be positioned by GPS, among which the datum point of setting out refers to the design control pile and leveling pile.
2、一定要凭证图纸的作业要求设置控制桩,一定要批注桩号、里程、地面标高、转角高度等数据。
2. The control pile must be set according to the operation requirements of the drawings, and the pile number, mileage, ground elevation, corner height and other data must be indicated.
3、在定测资料清静面或是断面图纸上批注地下的障碍物,其次是,要包管线路和地下修建物交织两侧的控制规模为3米,同时,须要设置忠言牌和警示桩。警示桩上须要写上相关的数据。好比:埋深,交织尺寸等。
3. The underground obstacles shall be indicated on the location survey data and plane or section drawings. Secondly, the control range on both sides of the intersection of the line and underground structures shall be 3 meters. At the same time, warning signs and warning piles shall be set up. Relevant data shall be written on the warning post. For example: buried depth, cross size, etc.
4、关于划线方面,要凭证轴线和警示桩的界线之间拉一根绳子,撒上白石灰划线。完成划线,要整理现场的障碍物。
4. In terms of scribing, a rope shall be drawn between the axis and the boundary of the warning pile, and white lime shall be sprinkled for scribing. Finish marking and clear the obstacles on site.
5、关于移桩方面,是在划线完成之后扫除整理之前,将所有需要的线管桩平移到土堆的旁边,规模控制在0.3m。
5. In terms of pile moving, all the required line pipe piles shall be moved to the side of the soil pile after the completion of the lineation and before the cleaning, and the range shall be controlled within 0.3m.
电缆警示桩是埋设在自然气高压管线沿线以塑钢、玻璃钢、复合材质为主,涂有黄色标记的电缆走向警示桩,为起提醒警示作用,您若是有需求就来我们网站举行咨询吧!
Cable warning posts are mainly made of plastic steel, glass fiber reinforced plastic and composite materials, which are buried along the natural gas high-pressure pipeline and are painted with yellow marks. To serve as a warning, you can come to our website if you need Consult!