µ±¿ªÍÚÊ©¹¤Ê± £¬ÈçÍÚµ½È¼Æø¾¯Ê¾´ø £¬ÔòÌåÏÖÔÚÏ·½0.30.5Ã×´¦ÓÐȼÆø¹ÜµÀ £¬Æðµ½Á˾¯Ê¾ºÍ± £»¤×÷Óá£ÏÂÃæ¾ÍÀ´½²½²È¼Æø¹ÜµÀ¾¯Ê¾´øµÄ¹æ¸ñºÍÂñÉèÒªµãÐÅÏ¢°É¡£
During excavation, if a gas warning tape is found, it indicates that there is a gas pipeline 0.3 to 0.5 meters below, which plays a warning and protection role. Next, let's talk about the specifications and key points of embedding of gas pipeline warning tape.
ȼÆø¹ÜµÀ¾¯Ê¾´ø»ù±¾¹æ¸ñ
Basic specification of warning tape for gas pipeline
²úÆ·Ãû³Æ£ºÈ¼Æø¹ÜµÀ¾¯Ê¾´ø £¬µØÂñ¾¯Ê¾´ø £¬pe¾¯Ê¾´ø
Product Name: gas pipeline warning tape, buried warning tape, PE warning tape
²úÆ·²ÄÖÊ£ºPE,¿í½ðÊôË¿ £¬¿íÂÁ²­
Product material: PE, wide wire, wide aluminum foil
²úÆ·¹æ¸ñ£ºPEµØÂñ¾¯Ê¾´ø£º10cm £¬15cm £¬20cm £¬30cm £¬40cm £¬50cm £¬100cm¡ £¿É̽²âµØÂñ¾¯Ê¾´ø£º15cm £¬20cm¡£
Product specification: PE buried warning tape: 10cm, 15cm, 20cm, 30cm, 40cm, 50cm, 100cm. Detectable buried warning tape: 15cm, 20cm.
ЧÀÍÔÊÐí£º90ÌìÖÊÁ¿ÎÊÌâÎÞÌõ¼þÍË»õ £¬ÔöÖµ·¢Æ±¡£
Service commitment: unconditional return of 90 days quality problems, value-added invoice.
ȼÆø¹ÜµÀ¾¯Ê¾´øÂñÉèÒªµã
Key points for embedding warning tape of gas pipeline
1.¹µ²Û¿ªÍÚ¡£
1. Trench excavation.
(1)»ìÄýÍÁ·ÃæºÍÁ¤Çà·ÃæµÄ¿ªÍÚӦʹÓÃÇиî»úÇиî¡£
(1) The excavation of concrete pavement and asphalt pavement shall be cut by cutting machine.
(2)¹ÜµÀ¹µ²ÛÓ¦°´ÉèÍýÏ붨µÄƽÃæλÖúͱê¸ß¿ªÍÚ¡£µ±½ÓÄÉÈ˹¤¿ªÍÚÇÒÎÞµØÏÂˮʱ £¬²Ûµ×Ô¤ÁôֵӦΪ0.05~0.10m;¹ÜµÀ×°ÖÃÇ°Ó¦È˹¤Çåµ×Éè¼Æ±ê¸ß¡£
(2) The pipe trench shall be excavated according to the plane position and elevation specified in the design. When manual excavation is adopted and there is no groundwater, the reserved value at the bottom of the trench shall be 0.05 ~ 0.10m; Before pipeline installation, the bottom shall be manually cleaned to the design elevation.
(3)¹Ü¹µ¹µµ×¿í¶ÈºÍÊÂÇé³ß´ç £¬Ó¦Æ¾Ö¤ÏÖ³¡ÏÖÕæÏàÐκ͹ܵÀ·óÉèÒªÁìÈ·¶¨¡£µÈµÈ¡£
(3) The width and working dimension of the trench bottom shall be determined according to the actual situation on site and the pipeline laying method. wait.
¹ÜµÀ¾¯Ê¾´ø
2.»ØÌîÍÁ¡£
2. Backfill.
(1)²»µÃ½ÓÄɶ³ÍÁ¡¢À¬»ø¡¢Ä¾Áϼ°ÈíÐÔÎïÖÊ»ØÌî¡£¹ÜµÀÁ½²à¼°¹Ü¶¥ÒÔÉÏ0.5mÄڵĻØÌîÍÁ £¬²»µÃº¬ÓÐËéʯ¡¢×©¿éµÈÔÓÎï £¬ÇÒ²»µÃ½ÓÄÉ»ÒÍÁ»ØÌî¡£¾à¹Ü¶¥0.5mÒÔÉϵĻØÌîÍÁÖеÄʯ¿é²»µÃ¶àÓÚ10%¡¢Ö±¾¶²»µÃ´óÓÚ0.1m,ÇÒÔȳÆÂþÑÜ¡£
(1) Frozen soil, garbage, wood and soft materials shall not be used for backfilling. The backfill on both sides of the pipeline and within 0.5m above the pipe top shall not contain debris such as gravel and bricks, and shall not be backfilled with lime soil. The stones in the backfill soil 0.5m above the pipe top shall not be more than 10%, the diameter shall not be more than 0.1M, and shall be evenly distributed.
(2)¹µ²ÛµÄÖ§³ÖÓ¦ÔڹܵÀÁ½²à¼°¹Ü¶¥ÒÔÉÏ0.5m»ØÌîÍê±Ï²¢Ñ¹Êµºó £¬ÔÚ°ü¹ÜµÄÇéÐÎϾÙÐвð³ý £¬²¢Ó¦½ÓÄÉϸɰÌîʵÎó²î¡£
(2) The support of the trench shall be backfilled and compacted at both sides of the pipeline and 0.5m above the pipe top, and then removed under the condition of ensuring safety, and the gap shall be filled with fine sand.
(3)¹µ²Û»ØÌîʱ £¬Ó¦ÏÈ»ØÌî¹Üµ×Ðü¿Õ²¿Î» £¬ÔÙ»ØÌî¹ÜµÀÁ½²à¡£µÈµÈ¡£
(3) During trench backfilling, the suspended part at the bottom of the pipe shall be backfilled first, and then both sides of the pipe shall be backfilled. wait.
3.¾¯Ê¾´øÆÌÉè¡£
3. Laying of warning tape.
(1)ÂñÉèȼÆø¹ÜµÀµÄÑØÏßÓ¦Ò»Á¬ÆÌÉ辯ʾ´ø¡£¾¯Ê¾´øÆÌÉèÇ°Ó¦½«ÆÌÉèÃæѹʵ £¬²¢Æ½ÕûµÄÆÌÉèÔڹܵÀµÄÕýÉÏ·½ £¬¾à¹Ü¶¨µÄ¾àÀëÒËΪ0.3~0.5m £¬µ«²»µÃÆÌÉèÓÚ·»ùºÍ·ÃæÄÚ¡£
(1) Warning tapes shall be laid continuously along the buried gas pipelines. Before laying the warning tape, the laying surface shall be compacted and laid flat directly above the pipe. The distance from the pipe should be 0.3 ~ 0.5m, but it shall not be laid in the subgrade and pavement.
(2)¾¯Ê¾´øÒ˽ÓÄÉ»ÆÉ«¾ÛÒÒÏ©µÈ²»Ò×ÆÊÎöµÄÖÊÁÏ £¬²¢Ó¡ÓÐÏÔ×Å¡¢Àο¿µÄ¾¯Ê¾Óï £¬×ÖÌ岻ӦСÓÚ100*100mm¡£
(2) The warning tape shall be made of yellow polyethylene and other materials that are not easy to decompose, and shall be printed with obvious and firm warning words. The font shall not be less than 100 * 100mm.
ÒÔÉϾÍÊÇС±àΪÄúÏÈÈݵÄȼÆø¹ÜµÀ¾¯Ê¾´øµÄ»ù±¾ÖªÊ¶ÁË £¬Ö÷Òª´Ó¹æ¸ñ¡¢ÂñÉèÁ½¸ö·½ÃæΪÄúÏÈÈÝ £¬Ï£Íû¶ÔÄúÓÐËù×ÊÖú!¸ü¶àÐÅÏ¢»ñÈ¡¾ÍÀ´ÎÒÃÇÍøÕ¾×Éѯ°É¡£
The above is the basic knowledge of the gas pipeline warning tape introduced to you by the editor. It is mainly introduced to you in terms of specification and embedding. I hope it will be helpful to you! For more information, please visit our website Consult.