µçÀ¾¯Ê¾×®ÔÚ²Ù×÷·½ÃæÐèҪעÖØ

ȪԴ£º/ Ðû²¼Ê±¼ä£ºÈÕÆÚ£º2022-08-22 0´Î
µçÀ¾¯Ê¾×®¾ÍÊÇÓ¦ÓÃÔÚµçÀÂÉÏ·½µÄ¾¯Ê¾×®²úÆ·£¬Ò»Ñùƽ³£Ï·½ÆÌÉèÓеçÁ¦µçÀ£¬ÉÏ·½ÂñÉ辯ʾ׮£¬Æ侯ʾ»òÕß±ê¼Ç×÷Óá£ÄÇô´Ë¾¯Ê¾×®ÔÚ²Ù×÷·½ÃæÐèҪעÖØʲôÄØ £¿
The cable warning pile is the warning pile product applied above the cable. Generally, the power cable is laid below and the warning pile is buried above. Its warning or marking function is. What should be paid attention to in the operation of this warning pile?
1¡¢ÕÉÁ¿·ÅÏߵĻù×¼µãÒ»¶¨Òª½ÓÄÉGPS¶¨Î»£¬ÆäÖзÅÏß»ù×¼µãÊÇÖ¸Éè¼Æ¿ØÖÆ×®ºÍË®×¼»ù×®¡£
1. The datum point of Surveying and setting out must be located by GPS. The datum point of setting out refers to the design control pile and leveling pile.
2¡¢Ò»¶¨ÒªÆ¾Ö¤Í¼Ö½µÄ×÷ÒµÒªÇóÉèÖÿØÖÆ×®£¬Ò»¶¨ÒªÅú×¢×®ºÅ¡¢Àï³Ì¡¢µØÃæ±ê¸ß¡¢×ª½Ç¸ß¶ÈµÈÊý¾Ý¡£
2. The control pile must be set according to the operation requirements of the drawings, and the pile number, mileage, ground elevation, corner height and other data must be indicated.
3¡¢ÔÚ¶¨²â×ÊÁÏÇå¾²Ãæ»òÊǶÏÃæͼֽÉÏÅú×¢µØϵÄÕÏ°­ÎÆä´ÎÊÇ£¬Òª°ü¹ÜÏß·ºÍµØÏÂÐÞ½¨Îï½»Ö¯Á½²àµÄ¿ØÖƹæģΪ3Ã×£¬Í¬Ê±£¬ÐëÒªÉèÖÃÖÒÑÔÅƺ;¯Ê¾×®¡£¾¯Ê¾×®ÉÏÐëҪдÉÏÏà¹ØµÄÊý¾Ý¡£ºÃ±È£ºÂñÉ½»Ö¯³ß´çµÈ¡£
3. The underground obstacles shall be indicated on the location survey data and plane or section drawings. Secondly, the control range on both sides of the intersection of the line and underground structures shall be ensured to be 3 meters. At the same time, warning signs and warning piles shall be set. Relevant data shall be written on the warning pile. Such as buried depth, cross size, etc.
µçÀ¾¯Ê¾×®
4¡¢¹ØÓÚ»®Ïß·½Ã棬Ҫƾ֤ÖáÏߺ;¯Ê¾×®µÄ½çÏßÖ®¼äÀ­Ò»¸ùÉþ×Ó£¬ÈöÉÏ°×ʯ»Ò»®Ïß¡£Íê³É»®Ïߣ¬ÒªÕûÀíÏÖ³¡µÄÕÏ°­Îï¡£
4. As for the marking, a rope shall be pulled between the axis and the boundary of the warning pile, and white lime shall be sprinkled for marking. After completing the marking, clear the obstacles on the site.
5¡¢¹ØÓÚÒÆ×®·½Ã棬ÊÇÔÚ»®ÏßÍê³ÉÖ®ºóɨ³ýÕûÀí֮ǰ£¬½«ËùÓÐÐèÒªµÄÏß¹Ü׮ƽÒƵ½ÍÁ¶ÑµÄÅԱߣ¬¹æÄ£¿ØÖÆÔÚ0.3m¡£
5. As for the pile moving, all the required pipe piles shall be moved to the side of the soil pile after the marking is completed and before cleaning, with the range controlled at 0.3m.
±ðµÄÒªÖªµÀ¾¯Ê¾×®°´²ÄÖÊ·ÖÀà¿ÉÒÔ·ÖΪËܸ־¯Ê¾×®¡¢²£Á§¸Ö¾¯Ê¾×®¡¢»ìÄýÍÁ¾¯Ê¾×®¡£ÓÈÆäÊÇËܸ־¯Ê¾×®£¨pvc¾¯Ê¾×®£©ºÍ²£Á§¸Ö¾¯Ê¾×®Ö®¼ä·Ö²»ÇåÎú£¬ËüÃÇÁ©ÕßÖ®¼ä´ÓÔ¶´¦¿´ÆðÀ´ÊÇÏàËƵÄ£¬ÆäÊÃ÷ÈÕÕ¾ÉÓÐÒ»¶¨Çø±ðµÄ¡£
In addition, we should know that the warning pile can be divided into plastic steel warning pile, glass fiber reinforced plastic warning pile and concrete warning pile according to the material classification. In particular, there is no clear distinction between the plastic steel warning pile (PVC warning pile) and the glass fiber reinforced plastic warning pile. They look similar from a distance, but in fact there are some differences.
PVC¾¯Ê¾×®Íâò½ÏÁ¿Æ½»¬£¬²£Á§¸Ö¾¯Ê¾×®Íâò½ÏÁ¿´Ö²Ú£¬¿ÉÊDz£Á§¸Ö¾¯Ê¾×®µÄÇ¿¶ÈÒª±Èpvc²ÄÖʵľ¯Ê¾×®ÒªÇ¿µÄ¶à¡£
The surface of PVC warning pile is smooth, and the surface of FRP warning pile is rough, but the strength of FRP warning pile is much stronger than that of PVC warning pile.
Ëܸ֣¨PVC£©²ÄÖÊ ¹æ¸ñ£º100* 100£¨mm£©150* 150£¨mm£© ËֲܸÄÖÊ×®ÌåÖ»ÄÜ×ö³É°×É«£¬Ã±×ÓµÄÑÕÉ«·ÖΪ£ººìÉ«ºÍ»ÆÉ«Á½ÖÖ£¡ÒÔÉÏÎÄ×Ö¾ùΪ˿ÍøÓ¡Ë¢ÎÄ×Ö£¡
Plastic steel (PVC) material specification: 100 * 100 (mm) 150 * 150 (mm) plastic steel pile can only be made of white, and the color of the hat is divided into red and yellow! The above text is screen printed text!
µçÀ¾¯Ê¾×®ÔÚ²Ù×÷·½ÃæÐèҪעÖصÄÏà¹ØÄÚÈÝÎÒÃÇÔÚÉÏÊöÒѾ­½â˵Íê±ÏÁË£¬ÈôÊÇÄú¶Ô´ËÓÐÒÉÎÊ»òÕßÓвɹºµÄÐèÇó¾ÍÀ´ÎÒÃÇÍøÕ¾×ÉѯÏàʶ°É¡£
We have explained the relevant contents that need to be paid attention to in the operation of the cable warning pile. If you have any questions or purchase needs, please come to our website Consult and understand.